After much ado about a lot, my kitchen almost exists and is almost no longer a figment of my imagination… I say almost because the dishwasher, range hood, sink and disposal arrive tomorrow and will hopefully be installed on Wednesday.
Anyway, to recap since the August 1 closing we have:
- Gutted the kitchen down to studs and sub floor
- Tore down the wall between the kitchen and dining room, effectively creating an eat in kitchen
- Installed doggy door for Abby - now she can come and go as she pleases
- Dry walled ceiling we messed up when tearing down old wall, and leveling areas that once had a wall between them.
- Installed new floor in an attempt to match 80 year old wood floor in kitchen
- Ripped out three rooms worth of 1936 paneling from the master suite
- Re insulated the master suite
- Installed almost all the drywall in the master suite
- Took over a week to move 2 households into 2 storage units
- Sanded, stained, varnished kitchen floor, in addition developed allergic bumps to either floor stain or varnish
- Bought kitchen appliances
- And just yesterday, installed 75% of the kitchen cabinets
Yet to do:
- Finish mudding drywall seams in master suite
- Build storage cubbies to hold all our stuff
- Carpet master suite
- Refinish balance of first floor hardwood floors
- Move all of our stuff from storage units into house
- Install some sort of closet system in dressing room
- Install return and registers for kitchen and upstairs
- Paint - EVERY ROOM
- Have driveway poured
- Collapse when this is all over...
By the way, the kitchen looks better than I could have ever imagined - photos coming soon.